Monday, August 31, 2015
This is My Design
So this is my Eisenhower Quadrant. Basically everything in the Urgent/Important category are the things in my planner that have been bolded, underlined, or marked urgent in some way. The Not Urgent/Important things are the things that are always in the back of my mind that need to be done, but aren't a priority right now. The Urgent/Less Important things are things that will need to be done in the not to distant future, but right now I can keep that lower on my list. Then the Not Urgent/Less Important things are the things that I can do before bed as a reward for doing everything else and when I am winding down and not going to be looking at work.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment